Projects

ANSB PAST EXPERIENCE

Aero Nusantara Sdn. Bhd. (ANSB) was established on the 26th of February, 2019 and the compnay were able to secure projects year on year.
  • Submission on the Application of Grant for High Value-added Product Development (GVPD) from Malaysia Invesment Development Fund (MIDF) of Ministry of Investment, Trade and Industry (MITI) for the Proposed Enhancement of UAS Fleet Management System (UFMS) to UAS Fleet Management & Control (UFMC) System in collaboration with Research Center of Excellence for UAS (Re-CUV) UTHM and TNB Integrated Learning Solution (TNB ILSAS)

    Facilitation Consultancy Services (FCS) for Building Height Approval of Hap Seng Land Development at Jalan Dutamas, Kuala Lumpur

    Development of Aeronautical Chart for the new installation of Instrument Landing System (ILS) and Doppler VHF Omni Directional Range (DVOR) Navigation Equipment at Alor Setar, Subang, Sibu, Limbang and Tawau by Telekom Malaysia

    The Introduction of SMART SKY ECO-SYSTEM for the Smooth Transition of into the Urban/Advance Air Mobility (UAM/AAM) Environment

  • Facilitation Consultancy Services (FCS) for the Application of Authorization to Fly (ATF) for MRANTI (Malaysia Research Accelerator for Technology & Innovation) / DRAM (Drone Racing Association of Malaysia) DIY UAS or Drone Racing Demonstration at The Spice, Bayan Lepas, Pulau Pinang by Haf Drone Sdn. Bhd. (HDSB)

    Facilitation Consultancy Services (FCS) provided for the Appeal on the Maximum Allowable Mobile Crane Operating Height at Intel Pelican Project in Bayan Lepas, Pulau Pinang by Exyte

    Submission on the Application of Aerospace Investment Fund from Malaysia Invesment Development Fund (MIDF) of Ministry of Investment, Trade and Industry (MITI) for the Proposed Development of KL FIR AAM Smart Airways Project

  • Extension of Service for Independent Checker Consultant (ICC) ORAT for of New KL ATCC Project

    Workshop “Introduction of Airspace & Air Traffic Management in Malaysia” for Jabatan Audit Negara (JAN) for New KL ATCC Project

    Pre-Assessment Aeronautical Study conducted on the runway orientation for the proposed New Kuching International Airport in Sarawak by ZECON Berhad

  • Independent Checker Consultant (ICC) service provided for the Operational Readiness, Activation and Transition (ORAT) of New KL ATCC Project which involves the migration of [1] KL ATCC operation (including the Rescue Coordination Center – RCC and Joint Airspace Management Coordination Center – JAMCC), [2] the restructuring of Kuala Lumpur Flight Information Region (KL FIR) En-route sectorization (from 7 to 14 sectors), [3] the commission of new KL FIR's Communication, Navigation, Surveillance / Air Traffic Management (CNS/ATM) System, [4] the relocation of KLIA’s Airways Clearance Delivery (ACD) Controller Work Position (CWP) to KLIA Air Traffic Control Tower and [5] the introduction of Triple Independent Simultaneous Departures/ Arrival Operations at KLIA (3 runway capacity of 108 movement per hour) by ENAV AP

    Preliminary Aeronautical Study conducted on the runway orientation for the proposed New Kuantan International Airport in Pahang by Gading Group

  • Facilitation Consultancy Services (FCS) were provided for the certification of Asia Aeronautical Training Academy – AATA (a subsidiary company of Universiti Tun Hussien Onn - UTHM) as the Approved Training Organisation (ATO) - Flight Training Organization (FTO) by AATA

    Independent Checker Consultant (ICC) service provided for the Operational Readiness, Activation and Transition (ORAT) of University Tun Hussein Onn (UTHM)’s Tanjung Laboh Airport, Batu Pahat, Johor as the flight training hub for Asia Aeronautical Training Academy (AATA) by AATA